Tarmac Driveways
Norwich & Norfolk

Cost-effective, fast installation for large driveways

1-2 days

Installation

24-48hr

Ready to Use

£40-60/m²

Typical Cost

What is Tarmac Surfacing?

Tarmac (also known as asphalt or macadam) is a smooth, durable surface created by mixing aggregate with bitumen binder, then laying it hot and compacting it to create a solid, waterproof layer. It’s the same material used on roads and car parks, proven over decades to handle heavy traffic and extreme weather.

For driveways, tarmac offers a practical, cost-effective solution that can be installed quickly and used almost immediately. Unlike block paving which requires individual units to be laid and jointed, or resin surfaces which need extended curing times, tarmac is installed in one continuous process and becomes trafficable within 24-48 hours.

We install tarmac driveways using hot-rolled asphalt over properly prepared stone sub-bases. The surface is laid to correct falls for drainage, compacted while hot to achieve maximum density, and finished with either a smooth or textured surface depending on your preference. The result is a hard-wearing, low-maintenance driveway that can last decades with minimal attention.

  • Budget-Conscious Projects

    Most cost-effective

  • Fast Installation

    Ready in 24-48 hours

  • Large Driveways

    Economical for big areas

  • Heavy Vehicle Use

    Commercial-grade durability

  • Commercial Properties

    Practical solution

  • Smooth Surfaces

    Easy manoeuvring

Key Features

  • Most cost-effective option
  • Fast installation (1-2 days)
  • Ready to use in 24-48 hours
  • Extremely durable
  • Low maintenance
  • Smooth, continuous surface
  • Ideal for large areas
  • £10M insurance backed

Our Installation Process

  1. Free Survey

    Site visit to assess area, measure, and provide detailed quote

  2. Base Preparation

    Excavation and installation of compacted stone sub-base with proper drainage

  3. Tarmac Installation

    Hot-rolled asphalt laid to correct falls and compacted for maximum density

  4. Finishing

    Edges finished, surface sealed if required, ready for light use in 24-48 hours